性色生活片久久毛片婬片免费放女人一级毛片_一级特黄aaa大片在线观看成人一级片在线观看_亚洲国产午夜真人一级片中文字幕精品黄网站_国产精品久久久久一级片看免费视频一区二区三区_色欲国产麻豆一精品一av一免费一级片_成人免费毛片日韩在线视频最近中文字幕高清中文字幕无
簡體中文 | English
搜索:
首頁 關于我們 產(chǎn)品展示 新聞資訊 服務幫助 產(chǎn)品認證 案例展示 技術支持 聯(lián)系我們
當前位置 : 首頁 > 技術支持 > Pipe Bender Operation >
技術支持
- Elbow Classification
- Pipe Expander Maintenance
- Pipe Bender Operation
- Plate Rolling Machine Use and Maintenance
產(chǎn)品分類
彎頭機
彎管機
擴管機
三通機
壓力機
坡口機
模具
 
 
Pipe Bender Operation
How to Use IF Heating Pipe Bending Machine

The IF heating pipe bending machine can be used to bend pipes made of alloy steel, carbon steel, and stainless steel. It is an important piece of equipment to provide bent pipes for construction projects in petrochemical, electric power, and other fields. The operation method of induction bending machine is detailed below.

1. Install the steel pipe to be bent in place;
2. Adjust the bending radius via the screw-nut transmission device on the rocker arm rotating device;
3. Heat the steel pipe by the medium frequency induction heating coil to some temperature and start bending;
4. The steel pipe is pushed ahead hydraulically and it is deformed at the heating part to bend;
5. After the steel pipe deforms, spray water at it to cool it down. Thus, the required bent pipe is obtained.

The steel pipe bent by our induction bending machine features no stress and small wall thickness difference. The bending radius is adjustable within the range of 0 to 180 degrees.

Precautions
1. Before operating the induction bending equipment, prepare the equipment according to the IF power supply and IF transformer manuals. Start the equipment cooling water pump.
2. When the IF transformer is running, even with no load, it is strictly prohibited to stop the supply of cooling water. Waterway should be smooth to prevent water splashing on transformer.
3. It is allowed to open the main motor to start bending only when the steel pipe is heated to the temperature sufficient for bending and the pipe inner wall temperature is above 910℃ but lower than the permissible maximum heating temperature. It is strictly prohibited to start the main motor if the required bending temperature is not reached or the pipe is not heated. When bending is over and heating is stopped but the chuck is not released, it is also banned to start the main motor for the returning of rocker arm.
4. Before bending, the steel pipe should be carefully adjusted to make the chuck center consistent with the induction coil center. Also, the wheel used to support the pipe should be adjusted to a suitable height, so as to ensure that the pipe is fed smoothly and the bending part is in the same plane with the straight part.

 
最新產(chǎn)品
- 三通機械設備
- 優(yōu)質彎管機
- 彎頭機的檢測
- 中頻彎管機廠家
- 三通擠壓成型機
- 坡口機廠家
- 彎頭坡口機廠
熱門產(chǎn)品
- 優(yōu)質彎管機
- 主 5000T四柱式壓力機
- 500T四柱式壓力機
- 擴管機
- 1000T龍門式壓力機
- 1620mm 鏈條式彎管機
- 820mm 液壓中頻彎管機
推薦產(chǎn)品
- 優(yōu)質彎管機
- 主 5000T四柱式壓力機
- 500T四柱式壓力機
- 擴管機
- 1000T龍門式壓力機
- 1620mm 鏈條式彎管機
- 820mm 液壓中頻彎管機
快速檢索產(chǎn)品
?
聯(lián)系我們
孟村回族自治縣渤海液壓機械制造廠
地址:河北省滄州市孟村回族自治縣泊北工業(yè)區(qū)
郵編 : 061000
手機:15230713671
傳真: 0086-317-6218625
郵箱:15230713671@163.com
關于我們 |  產(chǎn)品中心 |  在線留言 |  聯(lián)系我們 Copyright © 2015-2016 孟村回族自治縣渤海液壓機械制造廠 版權所有 后臺
    
性色生活片久久毛片婬片免费放女人一级毛片_一级特黄aaa大片在线观看成人一级片在线观看_亚洲国产午夜真人一级片中文字幕精品黄网站_国产精品久久久久一级片看免费视频一区二区三区_色欲国产麻豆一精品一av一免费一级片_成人免费毛片日韩在线视频最近中文字幕高清中文字幕无